-
Park Hyatt, Saadiyat Island
-
Abu Dhabi Airport Terminal 1 Refurbishment
-
Qasr Al Sarab Desert Resort & Spa
-
Yas Links Golf Club
-
Mina 'A Salam Hotel
-
Manarat Al Saadiyat
-
Traders Hotel, Abu Dhabi
-
Madinat Jumeirah Resort (Phase 3)
-
Shangri-La Qaryat Al Beri
-
Media One Hotel
-
Mirdif City Centre
-
Marina Plaza
-
Kempinski Hotel, Mall of Emirates
-
Dubai Marina Mall, Hotel & Serviced Apartments
-
Al Manzil Hotel
-
Abu Dhabi Airport Terminal 1A & Terminal 2
Dubai International Airport Concourse 4Dubai , under construction
New Doha International Airport (FITOUT package)Doha, Qatar , under construction
Relocation of Dubai Airport Expo & Related Facilities to DWCDubai , under construction
Abu Dhabi International Airport - Arrivals Hall and TunnelAbu Dhabi, under construction
ALEC have been awarded a further contract with ADAC, the package for the construction of a new 5000m2 Arrivals and link tunnel from Terminal 1 and 3 within Abu Dhabi International Airport.
The project is worth approximately AED60m and will commence immediately. It will consist of a new tunnel beneath the main access road into the airport, and a vertical core consisting of 3 elevators and 2 travelators will link the existing terminal building to the tunnel and through to the Arrivals Hall. The arrivals hall will consist of meet and greet areas, toilets, car rental, coffee shop and various concessions stands.
More ›Abu Dhabi International Airport - US Customs & Border FacilityAbu Dhabi, under construction
The scope of work comprises the design and construction of a US Customs and Border Pre screening facility and stand alone baggage handling facility. In addition this includes the alteration of the current hold rooms to create 4No segregated hold rooms for US flights.
Other scope of works include but not limited to Site Establishment, Site Survey, Relocation of Existing Utility Services, Earthworks, Demolition, Concrete Works, Structural Steel, Tiling and all Fit out works, Acoustic Insulation & Waterproofing, Roof Cladding & External Glazing, Vertical Transport, Baggage Handling Equipment, SAS Installation, Fire Alarm and Suppression Installation, MEP, Statutory Approvals and External Works.
More ›Dubai International Airport Terminal 3 - Concourse ADubai, completed in 2012
The third concourse will have 20 contact gates, of which 18 will be for the A380. It is a fully airside structure and is connected to Terminal 3 via an automated people mover in addition to vehicular and baggage handling systems utility tunnels. Encased in its elliptical shape are 2 rectangular volumes that hold both 4 and 5 star hotels. The first and business class lounges are located on 2 separate levels below the hotel, including arrival and departure floors and a duty free area. ALEC's scope includes the overall co-ordination of the project, managing various subcontract packages and associated packages.
More ›Dubai International Airport - Al Majlis at Terminal 3Dubai, completed in 2012
Fast track refurbishment and new build of an existing airport building including a new building to provide Dubai Airport with a new VIP Al Majilis facility. The building comprises of full MEP and 5 star fitout works to provide amenities such as entrance lobby, lounges, Duty Free, customs, immigration and baggage screening areas, as well as associated external works. The new facility caters for both departure and arrivals of VIP guests.
More ›Abu Dhabi Airport Terminal 1 RefurbishmentAbu Dhabi, completed in 2011
Abu Dhabi Airport Terminal 1a & Terminal 2Abu Dhabi, completed in 2005
