• Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
  • Abu Dhabi Airport Terminal 1 Refurbishment
< >

Abu Dhabi Airport Terminal 1 Refurbishment Abu Dhabi, COMPLETED IN 2011

Refurbishment of the existing Terminal 1 including replacing of all floor tiles, ceilings, decoration and doors. Extension to the check in area and expansion ofexisting ground floor toilets. Refurbishment of the Al Ghazal Business lounge and the First and Business Class area including kitchen, bar, restaurant, lounge and meeting rooms.

Download Fact Sheet

Built up area: 20 000 m2
Contract period: 10 months
Contract value: AED 164 000 000 (US$ 44 500 000)
Location: Abu Dhabi
Client: SCADIA / ADAC
Project Manager: Parsons International
Architect: Corgan
Engineers: TYLIN
Quantity Surveyor: Davis Langdon
Interior Designer: PMDL
Related businesses: